November 4, 2026
LG May Supply Dual Lens Cameras for the iPhone 7 Plus as Sony is Behind Schedule [Report]

LG May Supply Dual Lens Cameras for the iPhone 7 Plus as Sony is Behind Schedule [Report]

Posted May 20, 2016 at 9:08pm by
Apple may be looking to LG Innotek to supply a majority of the dual lens cameras for the iPhone 7 Plus as Sony has reportedly fallen behind schedule, according to Nomura's Chris Chang.

We think Sony may not be able to deliver its full share of dual cameras to Apple due to: (1) lower-than-expected yield, and (2) damage to its production facility from the April earthquake in Kumamoto. As a result, we think LGI will gain majority share of the initial dual camera orders from Apple; hence, we upgrade to Buy.


Notably, Nomura is also predicting that Apple will bring OIS to the 4.7-inch iPhone.

We expect a sharp increase in camera module ASP from 2H16F as we think: 1) dual camera module is likely to command 2.5x ASP premium vs. single-cam, and 2) OIS (optical image stabilisation) will also be equipped in the new 4.7” iPhones – currently only the 5.5” model has OIS.

Leaked renders of the iPhone 7 and iPhone 7 Plus have shown changes to the opening for the camera that corroborate reports of a dual lens camera for the 5.5-inch iPhone and perhaps a better quality single lens camera for the 4.7-inch model. Check out a 360 degree video here.

You can follow iClarified on X, Facebook, or RSS for the latest updates on the iPhone 7 and the big redesign predicted for 2017.


[via Barrons]


LG May Supply Dual Lens Cameras for the iPhone 7 Plus as Sony is Behind Schedule [Report]
Add Comment
Would you like to be notified when someone replies or adds a new comment?
Yes (All Threads)
Yes (This Thread Only)
No
iClarified Icon
Notifications
Would you like to be notified when we post a new Apple news article or tutorial?
Yes
No
Recent. Read the latest Apple News.
RECENT
Tutorials. Help is here.
TUTORIALS
How To Back Up Your iPhone to an External Drive on Mac [Video]
How To Sideload Apps Onto Your iPhone Using Xcode [Video]
How To Find Your IP Address on iPhone [Video]
Where To Download iPad Firmware Files From
Where To Download iPhone Firmware Files From
Deals. Save on Apple devices and accessories.
DEALS